Sunday, March 4, 2018

Cobra: Short Situation Update | The Portal

THE PORTAL
The Intelligence Hub for the Victory of Light
Friday, March 2, 2018
Short Situation Update by Cobra


Clearing of underground Illuminati Breakaway Complex is proceeding with full speed.

The Light forces can not release much intel about surface operations to anybody without compromising the operations themselves. The Light forces have warned that in the absence of substantial intel, there will be a lot of banana intel circulating on internet. Thus much discernment is advised. Also, the Light forces are discouraging speculation about when the Event will happen.

The only thing they have requested me to share is the following: "Mjolnir technology is a fifth-dimensional Clifford torus, projected into fourth and third dimensions. Liberation of the surface of the planet will follow the Goldilocks principle."

If you wish to study surface topology of the Compression Breakthrough, you might be interested in reading the following book:


In the near future, I will be able to release a lot of intel not directly related to surface operations. The Light forces have requested me to release intel about Goddess mysteries and some "other" intel that was until now deeply classified. This intel may trigger strong reactions from many members of the surface population reading this blog.

Stay calm.

Victory of the Light!



Thursday, March 1, 2018

Evaluate contact risk


Merge Pandora / B96 removal, merge EELA / VTXC


STATE OF MISSION REPORT FEBRUARY 2018

Pandora in progress, EELA in progress, B96 removal in progress, Wipeout sequence in progress.  741L50 recovery, VTX realignment in position, minimum hyperphasic requirements not met, minimum VTXPOS requirements not met, contact established at VTXPOS = 1.8. PB clearing attempt in progress, clear timeline lock secured. M minimum requirements met.

Tuesday, February 27, 2018

L2 clear, wipeout L1
201 comments:

No comments:

Post a Comment